Demolition of LC Vertical Long Shaft turbine pumps

Source: China Vertical Turbine Pump Manufacturer Date:2022/2/16 21:43:35 visitors:Classificationvertical turbine pump

Demolition of LC Vertical Long Shaft Semi-submersible turbine Pumps


The disassembly sequence of LC vertical long shaft pump can be basically carried out in reverse of the assembly sequence. When disassembling LC vertical long shaft pump, the following points should be noted:


(1) Make matching marks at the necessary matching points to facilitate the next installation of LC vertical long-axis Semi-submersible turbine pump.

(2) Prepare some boxes, assemble and disassemble the parts, in order to prevent loss or scratch, fasteners are put separately.

(3) The following parts can not be reused, and spare parts need to be prepared: O-ring, paper cushion, rusty fastener, spring washer, filler.

vertical long axis turbine pump

Previous page:What are the causes of Vertical suspended Turbine Pumps packing leakage?
Next page:Solutions of LC vertical long axis turbine pumps

Leading Products

Mobile phone Scan to add WeChat

008613974960765